03 // Facility

The new standard for
radiation effects testing.

ARC was built to eliminate the scheduling bottlenecks and hardware compromises of clinical-facility moonlighting. We provide manufacturers a dedicated environment for rigorous component qualification.

Mission Profile

A consolidated, mission-ready environment for component qualification.

From CubeSat constellations to deep-space probes, our customers cannot afford the schedule risk of fragmented testing pipelines. ARC closes the loop from exposure to root cause inside a single facility.

Discuss a partnership →
01

Purpose-built

Hardware and beamlines optimised specifically for MIL-STD-883 and space-grade reliability — not retrofitted clinical equipment.

02

Dedicated access

7-day availability eliminates scheduling conflicts and clinical-facility moonlighting. Long-term beam-time partnerships available.

03

Independent

Privately owned — independent verification for satellite operators, defence contractors and aerospace manufacturers.

04

Consolidated

Proton, gamma, Flash X-ray and forensic failure analysis under one roof. No transit between labs, no chain-of-custody loss.

230 MeV
Peak proton energy
10⁷ cm⁻²/s
Maximum flux density
50 MeV
Degraded energy floor
7-day
Operational availability